Documentation / The flybrainwork handbook

Search is available when JavaScript is enabled. Browse categories below at any time.

FBW Devnet reference

The existing flybrainwork asset, public receipts and completed test budget.

Devnet3 min read
Download Markdown ↓

This reference identifies the existing flybrainwork / FBW token and completed Wallet Mining V3 acceptance on Solana Devnet. It is intended for reading and reconciliation. The completed issuance, adoption, payments and Result close must not be repeated as setup steps.

Complete public identity#

Field Value
Network Solana Devnet
Genesis EtWTRABZaYq6iMfeYKouRu166VU2xqa1wcaWoxPkrZBG
Token name flybrainwork
Symbol / decimals FBW / 8
Mint HCdV49RkqtC7pPwzHCYg5KtkmU8opifjojLbAyZXKgQW
Wallet Mining V3 program 5yxjnH1PSk8iQKfK3ejG4jfSkewkTKfcpJygojdb6sam
Finite stage 6CcCZodRjRq3WArpAEkpudVgiK4EhpsSaNiDL5zq8x6x
Initial issued atoms 31,183,324,300,000,000
Initial two-unit budget 200,000,000 atoms / 2 FBW

The name and symbol are display fields. Mint, genesis, token program, decimals, authorities and settlement program together identify the applicable asset and environment.

Issuance and custody#

The original supply was issued once under the three-pool model. Wallet Mining V3 adopted that existing supply into its fixed program-controlled pools. It did not issue a second cap.

Mint authority is revoked; freeze authority is absent. Metadata update authority remains with the supplied test wallet. That project wallet also retains program upgrade and authorized Result-close authority, so the deployment has explicit administrative trust.

Two finalized payments#

Round Reward Actual Result rent Finalized evidence
30 100,000,000 atoms / 1 FBW 5,852,160 lamports Payment transaction
31 100,000,000 atoms / 1 FBW 5,852,160 lamports Payment transaction

Both used actual complete-model scientific work and authorized full native replay under one grant. A holder burned ten atoms between payments. The following payment and prior-payment recovery succeeded without restoring mint authority.

Result closure and withdrawal#

The first dedicated Result was closed after retention, archive rechecking and two authorized archive certificates with the actual project signature. Its rent returned to the fixed project recipient. Permanent economic evidence remains paid.

The second 1,024-byte Result remains readable at CUwx4EwnmCQQPpzE2Wkoy5qFL7xdcKJ4mBvFJz7PS8Rv.

After explicit grant revoke, the miner withdrew 11,704,320 unused lamports. This was a refund of unused principal, not recovery of consumed rent. The public execution record links close and refund receipts.

Current state and inspection#

The initial two units are solved and their budget is fully paid. Their permanent unit and payment evidence remain unchanged.

Current user task-supply stage#

task-supply-20261013-v1 uses the same Devnet genesis, program, mint, policy and authorities. Its stage is PKG52R51QHcTS2ENH4jJJUpDawnvEVsUVK1DCNXFHuG. Two previously unused calibrated downstream populations receive distinct ScientificTaskIds and permanent economic units. The new budget is 200,000,000 atoms / 2 FBW, reserved before publication: 100,000,000 atoms / 1 FBW per verified winner. Plan revision 3 opened round 32 and queued the next goal.

The stage and both reservations have finalized receipts in task-supply initialization. The operator sent three budget transactions. No replacement mint, miner grant, winning candidate or reward payment was created for this renewal. This leaves the two units available for browser participants. Live remaining supply and funding can change; inspect the mining page before starting work.

Read the project Explorer, public config and finalized chain accounts together. An RPC fault should preserve already trusted finalized evidence. Do not turn an unavailable balance into a fabricated zero or assume a closed temporary Result means its payment never happened.

This is Devnet acceptance. It does not activate mainnet, formal emission, paid Marketplace services or production funding.

See feature availability for release scope and pending acceptance.